Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2017-07-16 02:01
118
Company Profile
By certification [File Integrity]
Contact:depcopower(Mr.)
Email:
Telephone:
Area:Beijing
Address:No. 152 Station Road, North Railway Station, Shapingbaqu, Chongqing, Chongqing, China (400030)
Website: http://depcopower.yidaonongye.com/
| Primepower | 119kVA |
| Standbypower | 131kVA |
| Frequency | 60Hz |
| Phase | 3 |
| Powerfactor | 0.8 |
| Ratedvoltage | 220V |
| Fuelconsumptionof100%load | 22.35L/h |
| Fuelconsumptionof50%load | / |
| Enginemanufacturer | FAWDE |
| Enginemodel | CA6DF2D-16D |
| Numberofcylindersandarrangement | 6L |
| Coolingsystem | water-cooled |
| Ratedspeed | 1800rpm |
| Cycle | Fourstroke |
| Aspiration | TURBOCHARGED |
| Bore x stroke | 110x115mm |
| Displacement | 6.55L |
| Speedgovernor | mechanical |
| Alternatormanufacturer1 | STAMFORD |
| Alternatormodel1 | |
| Alternatormanufacturer2 | MECCALTE |
| Alternatormodel2 | |
| Alternatormanufacturer3 | MARATHON |
| Alternatormodel3 | |
| Alternatormanufacturer4 | DEPCO |
| Alternatormodel4 | DPC274D |
| Excitertype | self-excited |
| Insulationgrade | H |
| Protectiongrade | IP23 |
| Environmenttemperature | ≤50°C |
| Relativehumidity | ≤30% |
| Altitude | ≤1000m |