Soundproofed diesel generators with Cummings, Perkins, engines and Stamford, Leroy alternators

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-10-27 06:57

  • Browse the number:

    200

Send an inquiries

Company Profile

Fuzhou Launtop M&E Co. Ltd

By certification [File Integrity]

Contact:launtop(Mr.)  

Email:

Telephone:

Area:Beijing

Address:Hongkuang Industrial Zone, Yangxia Town, Fuqing, Fuzhou, Fujian, China

Website: http://launtop.yidaonongye.com/

Product details
Model Number: LG66C5 Brand Name: LAUNTOP/LEEGA Key Specifications/Special Features: General informationDiesel generator setModel: LG66C5 / LG75C6Motor: Cummins 4BTA3.9G2Alternator: Stamford or Leroy SomerSpeed control type: electronicalPhase: threeFuel tank capacity: 220LT/58 US gallonSystem voltage: 24VFrequency: 50Hz/60HzEngine coolant flow: 0.0096m/m 0.132m/mAir intake flow: 3.54m/m 4.98m/m
Exhaust air flow: 9.9m/m 13.56m/m
Exhaust temperature: 540C 560C
Engine
Maximum output (kW): 64kW (50Hz /74kW (60Hz)
Number of cylinders: 4
Aspiration turbocharged
Cycle: 4
Fuel type: diesel
Standby power (2): 17/19
Prime power (1): 15/17
75% prime power (1) :11/13
50% prime power (1): 8/9
Combustion type: direct injection
Cooling type: water cooled
Bore: 102mm
Stroke: 120mm
Displacement: 3.9 L
Compression ratio: 17.3:1
Lubrication capacity: 9.5 liter
Coolant capacity: 8.3 liter
Alternator height (C): 1500mm, 1865mm
Insulation class: "H"
Net weight :1170kg/ 1490kg
Excitation type: self-excitation (PMG for optional)
Protection class: IP23
Certificates
Engine: ISO 3046,BS 5514,DIN 6271
Alternator: UTE NFC 51-111-105-110
ICE34-1, BS 5000-4999
NEMA MG 21, VDE 0530
Generator set: ISO 8528
(1)Prime power: ratings are as per DIN 6271, BS55114 and ISO-3046 with 10% overload capacity
(2)Standby power: power available at variable load for up to a max of 500 hours during one year of which 300 hours may be for continuous use
Certification: ISO 9001:2000
Shipping Information:
  • FOB Port: Fuzhou
  • Lead Time: 30 - 35 days
Main Export Markets:
  • Eastern Europe
  • North America
  • Mid East/Africa
  • Central/South America
  • Asia
  • Western Europe
  • Australasia

Download more information about this product